
Curated data points extracted from thousands of filings, reports, and operational logs.
Cost of limestone, clay, and other inputs per tonne.
Percentage of installed capacity actually utilized.
Measure of financial leverage and debt repayment capacity.
Average distance advanced by the drill in a single operating shift.
Proportion of the drilled interval from which intact core is recovered.
Index of rock mass quality based on intact core pieces longer than 10cm.